public History of the finished background jobs by cluster member

wordframe integra screen

To review the chart representation of all finished jobs by server and for the log period, you need to do:

  1. Log in to the WordFrame Integra Core Administration
  2. Click on the "Architect" tab in the upper left corner
  3. Click on the "Platform monitoring" menu in the main navigation bar
  4. Click on the "Cluster monitor" link in the "Front-end cluster" section on the left of the screen
  5. Click on the "Jobs" tab
The charts represent only the RAM utilization within the preset archive period for this log, managed by the System logs period page from the Architect's "Global settings" section. Have in mind that this is a very extensive log, as the records are very frequent, so keep its period within 2 weeks maximum length.

For optimal cluster performance, the background jobs should be evenly distributed between the cluster members. This applies of course, if the hardware specifications of the servers match.

Last edited by Boz Zashev on 29 Sep 2010 | Rev. 1 | This page is public | Views: 1
Comments: 0 | Filed under: Platform monitoring | Tags: